BAO’s Administration in One Year
…A Compilation of Projects/Initiatives…
This document is a comprehensive compilation of the achievements, projects, and initiatives undertaken during the first year of Biodun Abayomi Oyebanji's administration. The projects here have been arranged under the six pillars: Youth and job creation; human capital development; governance, arts, culture, and tourism; agriculture and rural development; infrastructure and industrialization. Each project, a building block— contributing to the foundation of a more prosperous Ekiti State.
PILLAR 1: GOVERNANCE
CIVIL SERVICE
- Procurement of furniture items and office equipment for the newly established Customary Court of Appeal
- Renovation and remodelling of old Governor’s Office Building, Ado Ekiti.
- Provision of five (5) luxurious buses for mass transit scheme
- The granting of full autonomy to the Ekiti State Internal Revenue Service (EKIRS).
- Payment of N29,278,008,353 as salary to state & local government workers (Oct 2022-July 2023).
- Disbursement of N267.07M as housing loan to 1,901 beneficiaries across the MDAs.
- Appointment of 14 permanent secretaries
- Appointment of 42 produce inspectors into the Ministry of Agric
- Appointment of 50 Forest guards/superintendents
- Normalisation of temporary appointment of 64 junior officers to different cadres in the civil service
- Repair of grounded vehicles in the local government service
- Purchase of 38 official vehicles for the HLAS In the local government service
- Renovation/remodelling of former Civil Service commission building to accommodate Customary Court of appeal, Ado Ekiti
- Remodelling of the Ministry of Justice office complex at the State Secretariat, Ado Ekiti
- Purchase and installation of UPS batteries to energise both radio and television transmitters to BSES, Ilokun, Ado-Ekiti
- Payment of N10,210,792,973.88 as pension to State & LG pensioners (Oct 2022-July 2023)
- Regularisation of appointment of 50 uniformed traffic officers in the Ekiti State Traffic Management Agency (EKSTMA)
- Promotion of 1,700 staff in the Primary Health Care
- Disbursement of N228.3M as car loan to 682 public servants (Oct 2022-July 2023)
- Merit-based appointments of auditor general, statistician general, surveyor general and secretary, audit service commission for local government
- Implementation of financial benefit of the year 2019 promotion exercise
- Appointment of 102 junior officers across MDAs
- Recruitment of people with disability (PWDs) and sign language interpreters into the state civil service
- Payment of N435,000,000.00 as gratuity to state & LG beneficiaries. (Oct 2022-July 2023)
- Commencement of free mass transit scheme for public servants and public secondary school students
- Procurement of 30 units of Toyota Yaris car for 28 permanent secretaries and 2 auditors-general in the Ekiti State Civil Service
- Renovation of the Deputy Governor’s Office
PLANNING & DEVELOPMENT
- Upgrading of the Data Centre at the Bureau of Statistics
- Capacity building through training and development programmes for six hundred and twenty seven (627) personnel in the local government service
- Sponsorship of representatives of organised labour to attend the 2023 session of the International Labour Organization (ILO) in Switzerland
- Medium Term Expenditure Framework (MTEF) training for local government chairmen and other top government officials at local government level
- Capacity building/training of 381 staff in the local government
- Training and establishment of 30 people with disabilities (PWDs)
- Establishment of Government Café
LAWS
- Ekiti State Roads Fund Law
- Ekiti Rural Access Roads Authority Law
- Ekiti State Wealth Fund Law, 2023
- Ekiti State Local Government Staff Loans Board Law, 2023
- Ekiti State Fire Service Department Law, 2023
- Ekiti State Local Government Administration Law 2023
- Presentation of the Ekiti StartUp Bill and Ekiti Watershed Bill to the Ekiti State House of Assembly for assent
SECURITY
- Repairs of operational pick-up vehicles and firefighting engines at Omuo and Ikole Ekiti
- Approval for the renovation of Ekiti State Fire Service HQ, Ado-Ekiti
- Purchase of armoured personnel carriers (APC), patrol trucks, security equipment that include; bullet proof vests, ballistic helmets, tactical boots, and motorola radios
- Completed Emergency Command Centre (ECC) to provide a central point for incident reporting
- Increment of security votes of chairmen of local government councils to improve security in the local areas
- Nigeria Security Tracker (NST) shows Ekiti State as safest state in Nigeria, 2022
- Refurbishment of six fire fighting vehicles
FIRST QUARTER BUDGET PERFORMANCE
- 34% performance of overall revenue
- 26% performance of Federal revenue collected
- 32% of Internally generated revenue
- 55% performance of capital development grants.
- 25% performance of total expenditure
- 33% performance of recurrent expenditure
- 22% performance of personnel cost
- 17% performance of capital expenditure.
SECOND QUARTER BUDGET PERFORMANCE
- 2% performance on the Internally generated revenue (IGR)
- 5% performance on the capital expenditure
- Overall revenue performance stands at 56.6%
- Overall expenditure performance stands 44.5%
PILLAR 2: INFRASTRUCTURE AND INDUSTRIALIZATION
POWER INFRASTRUCTURE
- Construction of a 3.75MW Independent Power Plant (IPP)
- Rehabilitation and connection of Erijiyan, Ikogosi and Ikogosi Resorts back to the National Grid to enhance the State tourism corridor
- Rehabilitation and connection of Ipole Iloro-Ekiti back to the National Grid
- Rehabilitation and reconnection of Ijan, Ilumoba, Aisegba, Agbado, Imesi, Ode, Isinbode, Egbe, Iro-Ayeteju and Omuo in Ayekire and Ekiti East LGAs and their LCDAs back to the National Grid
- Extension of 33KV network from 132KV Omisanjana transmission substation to Baptist High School and connection of Ilawe 33KV line with Erijiyan-Ekiti
- Installation of 500kVA 33/0.415 relief transformer at Ikogosi
- Extension of electricity from Eruku, Kwara State to agricultural zone in Iyemero and installation of transformers
- Extension of electricity from Omuo-Ekiti to Eda-Ile, Ikun Oba, Araromi and Ilasa Ekiti
- Extension of 11kV Independent Power Plant (IPP) network to NTA streetlight sub station
- Ongoing connection of the agricultural processing zone (APZ) in Ikole to the National Grid
- Ongoing replacement of conventional streetlight lamps with solar lamps as part of the State’s renewable energy roadmap
- Draft of Ekiti State Electric Power Sector Bill, 2023
- Purchase of outdoor switch module to migrate to 33kv power line, Ilokun, Ado Ekiti.
TRANSPORT INFRASTRUCTURE
- Construction of 2m by 2m by 10.3m double cell box culvert in Efon Alaaye
- Reconstruction (excavation and casting) of Igbara Odo- Ikogosi Lined drain road project.
- Rehabilitation of Agric Olope-Moferere/ Agric Olope-Odo Ado Road (17.52% Completion)
- Rehabilitation & construction of box culvert, repair of failed portions and other auxiliary works on Igede-Ilawe Road
- Rehabilitation of Ado-Iworoko Road (23% completion)
- Additional works on the construction of major concrete works on Ado-Ilawe-Igbaraodo-Ibuji Road
- Rehabilitation of Igbara Odo-Ikogosi Road (25% completion)
- Rehabilitation of Ilawe-Erijiyan Road (64.58% completion)
- Reconstruction of Ikere-Ilawe Road (8.9% completion)
- Rehabilitation of Ado township roads (97.55% completion)
- Rehabilitation of Ado-Ilawe Road (20% completion)
- Construction of G.R.A 3rd Extension Road, behind NTA, Ado-Ekiti
- Construction of Atlas (Ajebamidele)- Deeper Life-Alasia-Shepherd-Omisanjana Road, Ado-Ekiti
- Reconstruction of failed culvert and other auxiliary works in Efon Alaaye (58.6% completion)
- Completion of the Bus Terminal in Ado-Ekiti
- Extraction of roads within Ekiti State at geospatial data centre, using GIS software
- 90% completion of the construction of passengers’ terminal at the Ekiti State Agro-Cargo Airport
- Completion of dredging activities between Ado and Ikere with 7,949 metres dredged in Ikere Road, Omisanjana, Ureje community and Poly Road to Emirin and Ekiti South-West LGA
PILLAR 3: ARTS, CULTURE AND TOURISM
- Completion of the chamber for Traditional Rulers’ Council at Ado-Ekiti.
- Concession of Ikogosi Warm Springs to Glocient Hospitality.
- Ekiti State Contingent adjudged overall 3rd Best in all competitions at the National Festival of Arts and Culture (NAFEST), Lagos, 2022
- Ekiti State Contingent awarded the Best Performing International Troupe at the 36th edition of Surajkund International Craft MELA, India, 2023
- Payment of all outstanding arrears of allowances to all monarchs
- Provision of vehicles to the office of the State Council of Traditional Chairman
PILLAR 4: YOUTH DEVELOPMENT AND JOB CREATION
MSMEs
- Disbursement of N24,583,466.18 conditional credit/matching grants
- Disbursement of N28,800,000 operational support grants
- Disbursement N13,100,000 conditional grants to support IT-enhancement
- Empowerment of digital innovators with £6,000 in partnership with iUK KTN
- Disbursement of N46,123,273.00 as 50% payment to Eyitayo Housing Estate contractors
INVESTMENT
- Completion of Ekiti State Civic Centre renovation, and subsequent handover of the ground floor to anchor tenants, Jara/Shoprite
- Approval of N28M for Ire clay products limited recapitalization
SPORTS DEVELOPMENT
- Creation of Ekiti State Sports Commission (upgrade of the Sports Council to a commission)
- Renovation of the blown off roof of Oluyemi Kayode Stadium, Ado Ekiti
EKITI KNOWLEDGE ZONE
- Approval of Ekiti Knowledge Zone (EKZ) as a free trade zone, expected to provide over 12,000 jobs to young Ekiti people
DIGITAL SKILLS TRAINING
- Ekiti State in partnership with Tech4Dev and Meta launched Ekiti State Digital Academy (EDSA) to train 500 young Ekiti people across various technology tracks
- Launched the Innovation Grant Facility— World Bank initiative–innovation development and effectiveness in the acquisition of Skills (IDEAS)
- Ongoing construction of Ekiti Weaving Centre at the Ekiti State Skills Acquisition Centre, Ado Ekiti
PILLAR 5:
HUMAN CAPITAL DEVELOPMENT
EDUCATION
- Payment of N1,950,000 to best performing 2016/2022 NECO students
- Processing of bursary and scholarship awards for indigenes in tertiary institutions from undergraduate to postgraduate levels for 2023/2024 session
- Payments of bursary awards to 167 Ekiti State indigenes in the Nigerian Law Schools
- Prompt payment of running grants to public primary and secondary school teachers
- Renovation of 2 blocks of 2 classrooms at Saint Phillips United Primary School, AUD Nur/Pry School
- Construction of examination hall at Ajinare Grammar School, Ido Ile
- Construction of examination hall at Epe Community Grammar School, Epe, Moba LG
- Construction of a block of two classrooms and drilling of a motorized borehole in Asa-Ilumoba, Aiyekiire LG
- Construction of a block of two classrooms and drilling of motorized borehole in Osun Ekiti, Moba LG
- Procurement of ICT equipment at CAC Grammar School, Efon Alaaye
- Construction of a block of two classrooms and drilling of motorized borehole in Emure, Emure LG
- Renovation of mini examination hall at Ayede Grammar School, Ayede, Oye LG
- Construction of a block of two classrooms in Omuo Ekiti
- Construction of ICT centre with procurement of ICT equipment in Ilafon, Oye LG
- Construction of a block of 3 classrooms at Saint James Nur/Pry School in Ipole-Iloro, Ekiti West LG
- Ongoing construction of model schools in Ikere and Ikole LGAs
- Payment of N6.2bn as subvention to tertiary institutions
- Payment of N400M to offset outstanding obligations to SUBcontractors
- Development of a database on human resources for enterprise projects in public secondary schools in the state
- Awards of excellence and cash gifts to five (5) schools under enterprise and agricultural ventures in the state
- Construction of e-library at Ekiti State Polytechnic, Isan-Ekiti
- Construction of Ekiti State College of Agriculture and Technology, Isan-Ekiti
- Renovation of Army Command School at Isan Ekiti, Ekiti State
- Payment of WAEC fees for the 2022 and 2023 school certificate examination
- Projects awarded to technical colleges under the IDEAS project:
Government Technical College, Igbara-Odo Ekiti:
- Renovation of catering and hotel management craft workshop
- Renovation of computer craft workshop
- Provision of borehole, overhead tank and water reticulation
- Upgrading of library
- Renovation of project office
- Procurement of project vehicle
Government Technical College, ljero Ekiti:
- Renovation of electrical craft workshop
- Renovation of cosmetology craft workshop
- Renovation of IDEAS project office
- Provision of borehole, overhead tank and water reticulation
Government Technical College, Otun Ekiti:
- Renovation of agriculture mechanics craft
- Renovation of welding and fabrication craft
- Renovation of project office
- Provision of borehole, overhead tank and water reticulation
- Procurement of project vehicle
- Payment of N69,631,200.00, 3rd term 2021/2022 academic session running grants to public secondary schools
- Payment of N2,083,400 as school fees of fifteen (15) vulnerable girls
- Distribution of 3,510 laptops to secondary schools in Ekiti State under the AGILE project
- Recruitment of 1,300 primary school teachers and approval for 500 teachers for secondary schools
- Procurement of new buses and refurbishment of damaged buses for the three special schools in the state
- Donation of student mattresses and iron beds, renovation of structures, relief palliatives, cash donations to the three special schools in the state
- Purchase of UTME forms and payment for WAEC registration fee for the students with disabilities across the three special schools in the state
SOCIAL INVESTMENT
- Payment of ₦200,000,000.00 to 3,500 beneficiaries under the Ekiti State Cash Transfer Unit (SCTU)
- Enrollment of 1,326 beneficiaries into the Labour Intensive Public Works (LIPW) with N12,500 monthly stipends
- Distribution of N24,000,000.00 relief materials to the victims of the rainstorm disaster in Oke-Ako and Ijesa-Isu Ekiti
- Distribution of N50,000,000.00 relief materials to beneficiaries through the Federal Government Special National Economic Livelihood Emergency Intervention (SNELEI) programme
- Regular payment of monthly subvention/feeding allowance of institutions under the Ministry:
- Erelu Adebayo Children’s Home, Iyin- Ekiti
- Children Correctional Centre, Ado- Ekiti
- Family Court, Ado- Ekiti
- Transit Home for Abused Women and Girls in Agric-Olope, Ado-Ekiti
- Ekiti State Women Development Centre, Igede- Ekiti
(f) Government Pupils in Children’s Home Nursery/Primary School, Iyin- Ekiti
- Training of Gender Based Violence (GBV) responders i.e. social workers, traditional rulers, medical practitioners and the Judiciary on case managements, treatment referrals and role of facilities
WATER & SANITATION
- Drilling of motorised boreholes at 2 different locations in Aaye-Igede, Irepodun/Ifelodun LG
- Drilling of motorised borehole in Ipole-Iloro, Ekiti West LG
- Drilling of motorised borehole in Are-Araromi, Ikere LG
- Drilling of motorised borehole in Saloro, Ijero LG
- Drilling of Motorized Borehole in Ajebamidele, Emure LG
- Drilling of motorised borehole in Ayede, Oye LG
- Drilling of motorised borehole in Ibalogun-Omu, Oye LG
- Drilling of motorised borehole in Ojorube-Ogotun, Ekiti South West
- Drilling of motorised borehole in Esun, Ikole LG
- Drilling of motorised borehole in Omuo, Ekiti East
- Drilling of motorised borehole in Adin/Iro, Ekiti SouthWest LG
- Drilling of motorised borehole in Ilafon, Oye LG
- Drilling of motorised borehole in Isapa-Iye, Ilejemeje LG
- Drilling of motorised boreholes in Kajola-Ise, Ise/Orun LG
- Drilling of motorised borehole in Ayagbe-Omuo, Ekiti East LG
- Purchase of Mobile water quality testing equipment
- Development of improvement action plans for the sustainable urban and rural water, sanitation and hygiene (SURWASH) program
- Provision of 3 solar pumps and rehabilitation of 3 water borehole points of Fire Service at Ado, Ikere and Ikole Ekiti
- Construction of overhead tank and water reticulation in Aaye Health Clinic, Igede Ekiti
- Provision of Storex tanks for portable water supply at Algon Health Centre, Efon
- Dredging and desiltation activities of certain areas in Ekiti State:
- Orere river course, Oreremope community, behind Obasanjo Estate, Along Ikere, Ado Ekiti
- Olaoluwa-Omisanjana- Ureje-Olaoluwa- Alasia Community, Ado Ekiti
- Federal Polytechnic Road/Abuad culverts to Emirin intercept of Elemi
- Bashiri-Olohunda- Crowbiz/Aayemi/Balemo Onola
- Afao-Road-Oshodi-Ado Poly Bridge/Intercept, Ado Ekiti
- Omisanjana – Ile-Abiye–Egbewa, Sadiat Hotel Junction, Ado Ekiti
- Egbewa Junction – Baptist Secondary School, Ado Ekiti
- Aso Rock relaxation, Tosin Aluko Garage, Omolayo Standard Press, Ado Ekiti
- Bisi Egbeyemi/Tope Alabi Road, Ado Ekiti
- Police Station, New Iyin road–Secretariat Junction and NTA road, House of Assembly Junction, Ado Ekiti
- Ekiti State awarded the best state in Sustainable Urban and Rural Water Supply, Sanitation and Hygiene (SURWASH) Programme
- Registration of rigs, licensing of borehole drillers and monitoring of borehole drilling activities for the purpose of data gathering by the Ekiti State Water and Sanitation Regulatory Agency (EK-WASRA)
HEALTHCARE
- Installations of medical equipment in secondary health facilities across the state
- The conduct of DHIS2 and health facility registry/data system to improve data systems in the state
- The introduction of E-Renewal of registered nurses’ licences
- Flag-off of IMPACT Project in Ekiti State and distribution of N4.6M to 177 PHCs across the state
- Free Provision of family planning commodities to government-owned facilities (service delivery points) across the state
- Provision of laptops to 16 DSNOs in the 16 LGAs in the state
- Training of laboratory focal persons from 5 LGAs of the state
- Training on the implementation of the NCD program
- Capacity building of all surveillance focal persons on active case search and other disease surveillance activities
- Disbursement of N100,000 per PHCs under the basic health care provision fund (BHCPF)
- Scale up of ‘Ulerawa’ Health Insurance Intervention from 5 LGAS to 10 LGAs in the state with a total of 50,000 beneficiaries
- Screening for cervical cancer in 10 selected facilities across the state with the support of World Health Organisation (WHO) and Clinton Health Access Initiative
- 17 Emergency Operations Centres (EOCs) established and functional across the state (1 per LGA) to discover and respond to health events
- Establishment of cholera reference laboratories at EKSUTH and SSH, Ikole
- Renovation of pharmacy and Ministry of Budget, Economic Planning & Performance Management laboratory section at Elegbewa Primary Health Centre in Ido Ile
- Renovation of Medical Staff Quarters in Aaye-Igede, Irepodun/Ifelodun LG
- Construction of the basic health centre in Isapa-Iye, Ilejemeje LG
- Construction of Health Workers Quarters and drilling of motorized boreholes in Kajola-Ise, Ise/Orun LG
- Renovation and extension of Ayagbe Primary Health Centre to accommodate male and female wards in Ayagbe-Omuo, Ekiti East LG
- Procurement of medical/health equipment in Epe, Moba LG
- Renovation of Are/Araromi Primary Health Centre in Are-Araromi, Ikere LG
- Renovation of the Primary Health Centre in Saloro, Ijero LG
- Construction of a science laboratory in Ajebamidele, Emure LG
- Procurement of medical/health equipment in Ibalogun-Omu, Oye LG
- Construction of pharmacy section at Ogotun Basic Health Centre in Ojorube-Ogotun, Ekiti South West
- Construction of a science laboratory in Esun, Ikole LG
- Construction of a Primary Health Centre in Adin/Iro, Ekiti SouthWest LG
- Construction of a science laboratory and procurement of medical/health equipment in Iro-Ayeteju, Aiyekiire LG
- Renovation of House Officers’ Quarters at Ekiti State University Teaching Hospital, Ado-Ekiti
- Payment of hazard allowance to doctors and clinical health workers in the state’ ministry of health and hospitals management board
- Implementation of salary parity for clinical staff of the hospitals' management board
- Construction of neo-natal intensive care unit at Ekiti State University Teaching Hospital (EKSUTH), Ado-Ekiti
- Repairs of 6 rescue and ambulance vehicles
- Construction of a two-room bungalow and reroofing of Aroto Health Clinic, Aroto
- Renovation of the Primary Health Care building, Oke-Emure
- Renovation of the Basic Health Centre, Ode II, Aiyekire
- Renovation of the Basic Health Centre, Aramoko
- Renovation of the basic Health Centre, Erifun, Ado Ekiti
- Reroofing of the Iro Health Clinic, Iro Ekiti, Moba LG
- Reroofing of the Health Clinic, Ikosu Ekiti, Moba LG
- Construction of a two bedroom bungalow at the Ikun Health clinic, Ikun Ekiti, Moba LG
- Construction of perimeter fencing of the basic Health centre, Iworo, Omuo Ekiti
- Installation of CT scan machine and dehumidifier in ICU building in EKSUTH, Ado Ekiti
- Renovation of 12 secondary Health Facilities across the state
- Completion of a pilot study by SignalADoc, a private company that leverages on artificial intelligence (AI) to improve health outcomes (January to March, 2023)
- The State was adjudged best performing state in the quarterly National Adverse Events Following Immunisation (AEFI) review meeting, December, 2022
- Ongoing construction of drainage and road along Doctor’s Quarters in EKSUTH, Ado Ekiti
- Equipping of Intensive Care Unit (ICU) in EKSUTH, Ado Ekiti
- Ongoing supply and installation of an oxygen plant in EKSUTH, Ado Ekiti
- Approval for public private partnership (PPP) on construction of students’ & interns' hostel in EKSUTH, Ado Ekiti
- Ongoing upgrade of two warehouses in EKSUTH, Ado Ekiti
PILLAR 6: AGRICULTURAL AND RURAL DEVELOPMENT
RURAL DEVELOPMENT
- Rehabilitation of 43.4 km farm roads across 6 LGAs
- Wet markets upgraded across 7 LGAs
- Ongoing construction of 8.4km Enu Odi Junction-Itaeku-Igirigiri Road
- Ongoing construction of 5.70km Omisanjana-Ben Folarin-Oke Aso Road
- Ongoing construction of 7.21km Ikogosi-Aba Osun-Aba Oriokuta-Ikogosi Road
- Ongoing construction of 8.765km Oye - Are Road
- Ongoing construction of 1.93km Afolu - Odofin Road
- Ongoing construction of 6.68km Erinmope – Irare – Ikosun Road
- Ongoing construction of 3.10km Ilupeju – Igbo Egan I – Ayede Road
- Ongoing construction of 4.60km Igbole – Egan - Iropora Road
- Ongoing construction of 5.305km Ise Road - Imola Road
- Ongoing construction of 2.85km Owode – Anaye Road
- Ongoing construction of 3.4km FMS – Oke Ako Road
- Ongoing construction of 2.05km Ara-Ekameta School Road
- Ongoing construction of 5.10km Iye-Isapa-Olopomeji-Ikun Road
AGRICULTURE & FOOD SECURITY
- Establishment of 2 hectares model polyclonal cashew farm/scion garden
- Sales of 12,000 hybrid cocoa seedlings at 50% subsidy to farmers
- Sales of 5,000 polyclonal cashew seedlings at 50% subsidy to farmers
- 25% subsidy on tractorization to farmers
- Enumeration of non exhaustive crops on 250 hectares of land
- Overhauling of the poultry pens at Livestock Development Centre (LDC)
- Construction of drainage system at the poultry site at Erifun
- Renovation of the existing borehole for steady supply of water at Erifun
- Payment of N20M counterpart fund for Livestock Productivity and Resilience Support (L-PRES)
- 50% subsidy on seeds for farmers (10kg/ farmer for rice, maize and cassava)
- Fumigation of poultry market against Avian Influenza
- Cassava cutting, maize seed and other farm inputs distributed to 6,202 beneficiaries
- 1,566 farmers supported with both production assets and small scale processing equipment
- Partnership with R-CONNECT, an agribusiness NGO on new farming techniques in 5 pilot schools
- Procurement of new uniforms for agricultural produce staff, four digital counter scales, one aqua-boy moisture metre and 20 scoops for grading grains
- Procurement of agricultural produce security clips
- Procurement of refrigerated van to the Butchers’ Association
- Procurement of agricultural inputs and farm assets to 500+ beneficiaries worth 40M under EK-CARES, under the state FADAMA project
- Partnered with SWAGCO and National Biosafety Management Agency (NBMA) to distribute selected agricultural inputs to farmers
- Payment of compensation of 50% second tranche valued at N21,080,440 to the Ikun Dairy farms landowners
- Payment of N10M compensation in respect of Agbeyewa farmland at Ipao Ekiti
- Distribution of anti-rabies vaccination and disease surveillance input across the 16 LGAs
- Empowerment of 1,631 youths and 80 people living with disability (PLWD) with various farm inputs and assets
- Empowerment of 37 youths in broilers production with successful raising and sales of 9,000 broilers in the first cycle
- Distribution of cheques to farmers in cooperatives
- Establishment of 6 hectares of oil palm plantation (filling of missing stand) in Orin Ekiti
Governance 45 Infrastructure & Industrialization 31 Arts, Culture & Tourism 6 Youth Devt. & Job Creation 13 Human Capital Development 112 Agricultural & Rural Devt. 41 Total 248 |
In addition to the above and quite important is the fact Governor Oyebanji has redefined governance with regular engagement with the citizens in both structured and unstructured manners.
He makes himself available to the people and mingle with them regularly, attends his political party meetings, visits schools and hospitals unannounced, personally supervises projects and has deliberately reduced cost of governance- no frivolous seminar or workshop for top officials. Till date he has not bought official cars for himself he uses the official cars inherited from the previous administration. He has not even changed the furniture in the Governor’s office or the Governor’s lodge. He believes those are not the immediate priority. Instead he puts such money to other more pressing needs for infrastructure upgrade, checking erosion, rehabilitation of schools and hospitals and completing ongoing projects and flagging of new ones as and when due.
He doesn’t believe project commissioning should be the hallmark of milestone celebration. His focus is to conceive and execute projects that have direct impact on the lives of the citizens and complete them. Commissioning can be done at anytime they are completed. He demonstrated this by commissioning the traditional council chamber and Bus Terminal in August and September. He says if another project is ready by Movemenr os December he will commission. He refused to commission the State IPP project that is 95 percent competed because he feels the project can be commissions when it is finally ready be it one or two kings later. I want it commissioned and working immediately” he says.
He also got the communities and local government leadership involved in the appointment of commisisoner and special advisers so that they can be responsible to the people. We are all servants of the people and no public servant should see himself as superior to the people.
He mixes with predecessors in office regardless of political party they belong. He also extends hands of fellowship to co contestants both within the party and outside the party.